[1]
Polo A, H. and Palma, Y. 2020. Correlation calculation between project complexity, measured by their arcs and nodes network, and project performance, measured using the earned value method. I+D Tecnológico. 16, 2 (Jul. 2020), 120-124. DOI:https://doi.org/10.33412/idt.v16.2.2840.