Polo A, Hector, and Yarissa Palma. “Correlation Calculation Between Project Complexity, Measured by Their Arcs and Nodes Network, and Project Performance, Measured Using the Earned Value Method”. I+D Tecnológico 16, no. 2 (July 31, 2020): 120-124. Accessed November 4, 2026. https://revistas.utp.ac.pa/index.php/id-tecnologico/article/view/2840.